Administrative Manual - Post Construction Requirements
Overview of the Stormwater Permitting Process at the City of Burlington
The Stormwater permitting process can be separated into three phases:
Planning, Preliminary Design, and Technical Review;
Final Design, Construction Drawing Review, and Permitting; and
Construction and As-Built.
Highlights of each of these phases are presented on three flow charts that are part of this Administrative Manual.
Please click on the above links for additional information and review the
City of Burlington Stormwater Ordinance
for more details.
Additional information can be obtained by contacting the City’s stormwater manager at 336-222-5140.
Post-Construction - TRC Submittal
Post Construction - Permitting
Post Construction - Construction & As-built